One Dishwasher Install, Walked Through from Valve to First Cycle

By , founder & appliance technician

August 16, 2023 · 7 min read
Planetcare 5Cpbwel6y6c Unsplash

Most of the work in a dishwasher installation is done on the floor in front of the sink cabinet, using a flashlight to check plumbing that has not been touched since the previous dishwasher was put in.

This is the point where problems with the existing plumbing and cabinet are usually found. The shut-off valve may have been painted over so that it will not turn, or the old drain hose may sag into a U shape that has been holding dirty water. The opening can also be lower than it should be, because new tile was laid after the cabinets were installed. These problems rarely show up during a phone call, and each one affects how the new dishwasher runs.

The steps below describe how we install a dishwasher in Ottawa and the reason for each step. This information is also useful when you compare prices, because a low quote often leaves out one or two of these steps.

Taking out the old dishwasher

We start by shutting off the water under the sink and turning off the power. There are two screws holding the old dishwasher to the underside of the countertop. With those removed, the dishwasher slides forward onto a towel.

Before the new dishwasher goes in, the technician checks the existing connections. He closes the shut-off valve. Then he opens it again. If the valve drips at the stem or doesn't fully shut off, it's easier to fix at this stage, while the cabinet's empty and the floor's dry.

He also takes a measurement from the floor to the bottom of the counter. And that height can shrink more than most people expect when new flooring is laid over old flooring. A dishwasher that's too tall for the opening has to be forced in, and it won't sit level afterward.

Connecting the new one

Whether it's a built-in, portable, drawer, under-sink or smart dishwasher, the connections are almost the same, so the job doesn't change much. That holds for Samsung, LG, Bosch, Whirlpool, KitchenAid, GE and Frigidaire too. Our dishwasher installation page covers all of these.

The dishwasher gets a new water supply line first. Its drain hose is run up into a high loop under the counter, or connected to the air gap if your sink has one, which keeps dirty sink water from flowing back into the dishwasher. Last, the power goes to the existing electrical supply.

With the hookups done, the dishwasher slides in and is levelled. Levelling is the step most often rushed on an installation. Side to side, level means the door closes evenly. Front to back, level matters because the water drains toward the pump. We finish by screwing two brackets into the countertop or the cabinet sides to hold the dishwasher in place, since without them, pulling a full bottom rack all the way out can tip it forward.

The first cycle

We switch the power back on. Our tools stay where they are for now.

Our technician runs a full cycle with the kick plate still removed. There's a light pointed at each connection, and he watches the dishwasher fill and drain. So if a fitting has a small leak, you see one drop, then another. Tightening that fitting is easy while the drip's still visible. With the kick plate on, that same drip can go unnoticed for weeks, soaking into a laminate floor until the edges start to lift.

A standard installation runs one to two hours, test cycle included. If a valve or drain needs fixing, that takes extra time. At the end we clear away the packaging and show you how everything works. And that's the reason we ask that someone 18 or older is at home at the start of the visit and at the end.

Comparing installation quotes

Two companies can quote a dishwasher installation in Ottawa and be pricing two different jobs. One quote might include a new supply line and a test cycle, with the installer staying to watch it. The other might only be sliding the dishwasher into place and plugging it in.

Ask each company about what is included in the price, and about what they do if the valve under the sink turns out to be seized. Their warranty and insurance are good to ask about too. Here, we carry liability insurance and workers' compensation coverage and the technician who comes to your home has been background checked.

Washers, dryers, fridges and ranges

For a washer, the work is mostly the hoses and the levelling. Our installation page says that washers get precision levelling to prevent excessive spinning vibrations, followed by a leak test. For a dryer, the most important part is the vent, which is set up for maximum airflow and fire prevention, and the job finishes with one full heating cycle.

A fridge with an ice maker or water dispenser needs a water line hooked up behind it. Electric ranges and ovens get aligned and hooked up, then tested. Range hood installation is a separate service. We mount range hoods under cabinets and on walls, and we also install island canopy hoods. We handle the ducting and dampers on the same visit. The CFM gets adjusted then too.

Where we stop, and what's covered

We stick to electric and induction cooking appliances. We don't do gas hookups.

If there's no outlet, or the circuit is too small, a licensed electrician has to do that work before we come. The same goes for plumbing beyond the existing supply and drain, such as moving a valve. Let us know about your setup when you book and we'll tell you if your home is likely to need either one.

Our installation work has a 90-day warranty. During that time, if a problem comes from our installation, we'll return and fix it at no extra charge. Anything defective in the appliance itself is a manufacturer's warranty issue, and we'll help you with the claim.

We're a family-operated business based in Kanata, and from there Stittsville and Carleton Place are a short drive. Liam S wrote "Very honest and friendly guys!" after an installation we did in Kanata. Megan E from Ottawa said we "had the part needed on hand", and it was her second time using us. To book, see our professional appliance installation page or call (613) 869-0101.

FAQ

Our dishwasher installation page says it usually takes one to two hours. We remove the old dishwasher and run the test cycle in that time. Expect longer if a valve's seized or the drain needs work.

Only the start and end of the visit need someone at home. Someone 18 or older lets the technician in. Then at the end, he walks them through how the new machine works.

We install electric and induction ranges and ovens. We don't do gas hookups.

Please call us about it. Our installation work comes with a 90-day warranty. We'll fix the leak at no extra charge if it's coming from one of our connections. The manufacturer's warranty handles a fault inside the dishwasher, and we'll help you start that claim.

More from the blog

Learn How to Help Your Dryer Work as Long as Possible
Dryer Repair 6 min read

Learn How to Help Your Dryer Work as Long as Possible

To ensure your dryer works efficiently and lasts for years, your maintenance habits are crucial. Discover the best practices, including cleaning the lint filter before every cycle and dividing laundry by fabric weight. These simple strategies, combined with using lower heat and air drying when possible, will maximize your machine's lifespan and save energy.

Read article
100%
Guaranteed

Same-day service across Ottawa, flat-rate pricing, and every repair backed by our warranty.

(613) 869-0101